Sanitary trunk sewer is blocked requiring emergency bypass pumping (up to 19.4 million gallons/day).
Drilling fluid “frac out” next to river bed. Pumping system delivered and setup same day, fluid pumped backed to drill mud reclaimer 3000’ away
Sink hole and water main collapse
Hurricane Ike response. Waste water treatment plant experienced flow increase of 33% over permanent pump capacity. System mobilized and setup on Sunday afternoon during storm within 4 hours of call
- Emergency trunk failure, set-up immediately and operational for 3+ months
Mobilizing to address a blocked sanitary sewer requiring bypass pumping
Stormwater bypass pumping with a 12” critically silenced pump capable of 5.7 million gallons per day, with filtered discharge to environmentally sensitive wetlands.
Sanitary bypass pumping using two 12” pumps on primary and one 12” pump on backup. Pumping 10 million gallons per day.
Hurricane Ike response. Waste water treatment plant experienced flow increase of 33% over permanent pump capacity. System mobilized and setup on Sunday afternoon during storm within 4 hours of call